Thursday, April 28, 2016

Sometimes the notches are buenas (I couldn't resist)

After getting boards down on the big expanses of deck, there’s a frustratingly slow process of filling in the edges, around the rails and bench supports.  I mentioned that this time I was clever(ish) and planned ahead for where I would set the rail posts on the driveway side, placing a 4” wide deck board down temporarily as a place holder 4’ out from the corner of the house, and 8’ out (the corner piece is an odd angle and sides on top of the deck boards, and does not have the tangs sticking out below). 

But the other places, where the supports interrupt the deck boards, there’s a bit of fine carpentry demanded.  Here’s one of the boards already notched, and ready to put in place.  Yes that is an almost empty container of #8 x 3" Coppergard deck screws, which started out holding 800 pieces.  And there's another full one waiting.
And here is the board actually in place.  Sometimes the marking and cutting and chiseling work perfectly, and sometimes they don’t; that tool in the foreground, a Surform, becomes my best friend, as it allows for removing material quickly and accurately without having to go back to the saw station.
This shows the process for the next board that will match the previous one (and yes, you do have to look ahead when setting deck boards, to ensure that you don’t end up with a gap that you can realistically cut a piece to fill: you can’t notch so deeply that there’s not enough continuous board to be able to pick up the piece of wood!).  Here I have cut the notches following my guide marks, and made additional cuts between the marks about every inch or so.  Then I tap out the little blocks with handy chisel (yes, I usually use a mallet, but this chisel has a nice metal head and it’s sort of a beater anyway, so sue me).  A few passes with the Surform to clean up the notches…
...and VoilĂ .  Pretty cool.  I was accurate enough with my locations and depths that I can put the half-inch plywood spacer-strips in and screw it down!  Yes that is a gnarly know there, but it adds character (like wrinkles).



Tomorrow, corner pieces and maybe some benches!

Tuesday, April 26, 2016

Rail-ity check

Anyone who's done construction knows that stairs represent a building challenge far in excess of their ubiquity their mundane appearance: not only does one have to calculate spacings for perfectly consistent rise and run (your feet can perceive 1/16" differences in riser height, and trip hazards result if the you're off by 1/8"), but posts and rails take a lot of load without being naturally easy to brace.  Tom had patched the old stairs about five years before now, and had noted how shaky the rails were, even as short as the stair run had been. 

With the longer upper stair he determined that more posts equalled more strength, as detailed in a previous blog.  Here he's made the angle cut on the tops for the right side, and is about to secure the last post, that will hold the end of the handrail as well as link to the deck railing along the rose-bush side.
Getting the interstitial rails to fit without distracting gaps is a finicky task, and Tom spent the better part of an afternoon cutting these parallelograms so they would seat nicely within the plane of the posts, and provide good fastening surfaces for the vertical pickets that will grandkid-proof the stairs and satisfy code.  Clamping the stops and making sure everything is parallel and even requires patience and skill, as I discovered when I did the main steps at the Big House last fall.

Here's the top rail in place.  It's an interesting design dilemma: you want to have a rail that is relatively easy to grip, but you also want it to cover the top of the posts.  If you set a larger cap over the top the look is chunky and small hands can't grasp it.  We could rip a 2 x 6 and have a source for pickets with the off-cuts, and that would give us a little more coverage above the posts, but I'm not convinced.  We've made the stairs wide enough that we could hang an inboard handrail if that seemed like a good idea down the line.

Bench supports

After some family consultation aided by a mockup of a possible new design we built, we broke out the jigs and templates we'd used on the 15-degree angled bench and rail system we'd perfected for the Big House deck.

Here's the workstation up on the badminton court.  We're using new redwood for its dimensional consistency and aesthetics, but slotting in off-cuts of milled wood for non-exposed pieces.  Muggs has cut all the pieces in advance, and then slides them into the jig so that all the angles and lengths and clearances are completely consistent.   He secures them first with construction adhesive and screws, and then drills for 1/2" bolts to ensure that each unit is bombproof.


The tangs of each support fit over a joist and extend below, to be bolted both to the joist and to a strut below the joist.  In this way the strains on the slanted rails are distributed widely (in contrast to the ways the original Big House deck supports were constructed, which localized stress on the ends of 2 x 4s, with harrowingly rickety results after 20 years).  Here he is checking the front edge for plumb before clamping and bolting.

The board along the back ensures that the bench in this dining area will be as straight as we can make it.  Once all the bench supports and rails are in place I will move around with a cutting jig that I built and kept, and will quickly be able to cut off the supports to the correct level at the correct angle.

This view shows the bench supports in place.  When I lay the decking out I planned for 4" boards in the line of the locations of the bench supports, so that I could add the little cross piece underneath (to accept the lower tangs) and then not have to notch the deck boards to match the supports, a time-consuming and frustrating process.  I'll just cut the board, butt it up against the front edge, and re-screw it down, and then cut slightly angled pieces to continue under the bench and out to the edge of the deck


Getting Decklet in a Line

With my ancient laptop swallowing up a few un-backed-up photos, my record is slightly incomplete here, but I'll add a couple more posts to reflect recent work.

For the sake of maintaining an easy path to the work area we had delayed demolishing  the odd-shaped bit of decking that Tom rebuilt about 5 years ago, between the shower and the front of the deck, but one afternoon when I was stymied by lack of the right deck screws I attacked this mini-project. Removing the rusted-in screws demanded some vigorous work with a brace and bit (to maintain enough downward pressure--I now hate regular Philips-heads as they are much more prone to stripping than square-drives or Torx-drives!).

I raised the frame the several inches it needed to match the new deck level, and was able to re-use the Simpson fasteners as well as one of the old joists. Building the structure this way left Muggs' drain system unchanged, and allowed for the eventual re-use of the boards, though the angle turned out to be slightly different.
After running the boards through the planer a couple of times and then rounding over the edges, I could dry-fit the new system, though I wouldn't be able to start pinning them down until I had secured the deckboards between the reference board and the edge of the house (which meant cutting for pipes, making sure the door opened smoothly, and adjusting the widths to reflect the non-straightness of the house itself).  The rains also posed a slight challenge, as the Vycor membrane on the new joists only sticks to dry wood.
Here's a detail of the piece nearest the front door, with the half-moons cut out to fit the vent stack on the right and the electrical feed on the left.  Any windblown rain that runs down the siding boards will be diverted away from the house structure by the flashing we added earlier.
I had to piece and rearrange a couple of boards and add a skinny one to make the end work out, a process made a little more frustrating because I was listening to Giants games during their losing streak.

As I had done on the Big House deck near the driveway, I decided to avoid large exposure of end grain (made worse by the angle cuts in this traezoidal deck-let) and add a "breadboard" edging piece, milled without a roundover so the inner edges meet flush.  I like the resulting look, and it should wear better than raw edges might.

One of the more satisfying operations in any deck job occurs when you finally trim off the ragged edges and achieve a more uniform look.  Giving a haircut this way demands a certain mind-set, and it's often a good idea to set things up and then wait until the next morning before making the do-or-die cut.  This was another example of listening to Muggs and saving myself a mistake.

Wednesday, April 20, 2016

Deck boards almost all down!

I may have alluded to some computer problems in an earlier post--well, they came back to bite me over the weekend, and I lost some photos that I was going to upload to the blog.  Nothing irreplaceable, and once I finished gnashing my teeth I realized what a First World Problem such matters truly are.

So I got up here Tuesday after having left on Sunday morning--I tarped the deck to avoid having the boards warp in the hot sun (I had run out of deck screws and the local builders' supply was closed for remodeling--and the heat was pretty tough to deal with.  Hence the umbrella, which made it livable!  I made good progress securing boards that I had pieced and placed, and here I am securing the rim joist, after cutting off all the joist tails.  Clamps allow me to make small adjustments to the height so the two perpendicular elements meet evenly all along the way--saving a lot of work on decking.
This was the view this morning--I've brought the remaining milled stock back over from the basement [I'll rebuild my little photo essay on the milling steps, how old deck boards get reclaimed, in another post], roughly arranged by length, and I've put Vycor tape on the bare joists the previous evening in the coolness--otherwise it's almost impossible to work with.

Then comes the process of test-fitting the boards before marking them and cutting them; it's where the creativity and ingenuity come into the process, and I sometimes get a real kick out of it when it's going well.  I realize it's a lot like quilting, the whole process, as one is constantly having to think spatially and determine how individual pieces fit into the bigger pattern.  Making sure the seams don't coincide too closely is one criterion, and another is minimizing the amount of good wood that gets cut off.  That tail extending from the pile is situated that way to remind me that there are a couple of blemishes in the middle, that I have to cut off and use the smaller bit for a stair tread or something. I know most professionals just use new wood or (gasp) manufactured wood products like Trex, which have the advantage of being perfectly regular, but honestly I can't abide that stuff...

Here's the view in the evening: I didn't do a ton more screwdriving past where I was in the morning, but I wanted to fit as much as I could so as to be able to tell Muggs how much to buy.  Turns out there's only a couple more 16' 2 x 6's to buy for the deck boards--the rest is salvaged!  The boards on the far left have some pretty significant knots so they'll be hidden under the bench we're going to put in.  I'll piece together some very thin boards (that had to get passed through the planer a few extra times) to fit the gap next to the house, and I still have the stair treads and the boards for the little deck-let next to the shower to mill down and install, but that will go fast.

Muggs has had a bunch of other clients to take care of while I have been squirreling away on milling and piecing, but he will try to get up here tomorrow to finish stair posts and set up for building the bench supports and rail supports.  I will contribute a bunch of small pieces to those assemblies, and I have to set up for installation of those supports once they're fabricated by Muggs.  I'll have to look at the original estimate but I think we will come out significantly ahead swapping my labor for not buying redwood deck boards--even though we'll be shelling out some significant dollars for rails, bench supports, and bench tops.

If it rains, I have lots of stuff I can still do, and if it doesn't, I'll keep plugging away, including the very satisfying task of setting a guide edge along the rough ends (foreground of this picture) and running the circular saw right along to get them all at once. 

Friday, April 15, 2016

Stairway posts and substructure

We've been punching out big days, with Muggs setting the main stairway posts and securing the bottoms to make them bombproof.

One of the classic problems with stairs like this one--shaky posts and rails--won't be an issue thanks to the extra beef (we're putting posts on 4 foot centers) and extra bolting underneath.
This shows all the posts initially placed with through-bolts underneath...
And here are temporary rails that keep the posts from twisting.  They have the additional benefit of serving as templates for cutting the mid-span rails--just scribe the lines and the resulting parallelograms will fit perfectly, and hold the vertical pickets as we grandkid-proof these stairs.

This shot also shows the path I've temped-in from the landing to the garden--we'll probably be able to make stairs out of scrap pressure-treated beams.
These tie-backs will stiffen the whole structure and relieve strain on the stair stringer, and we may join the post bottoms with a piece of wood, just because we can.

Tuesday, April 12, 2016

Milling! And a milestone....

I dashed back up to Inverness this morning and, mirabile dictu, I did not have anything pressing to do on the cottage, so I could put in a real day's work on the milling that I have been mentioning.

It's actually incredibly satisfying to do this unusual work: we budgeted the job as if we were buying new redwood, not knowing for certain how decayed and weathered the old boards actually were, but the idea was to reclaim as much as was practical, the way I did on the Big House deck. 

Tomorrow I may try to get some shots of the process itself, but meanwhile, here's a quick look.  This is the first stack of milled redwood, which I had de-nailed more than a week ago, but hadn't been able to run through the table saw twice (barely taking off a saw kerf's width of material with each pass, since there's not a lot of rot on the edges), run through the planer several times (some of the boards are deeply sun-scoured), and finish with a roundover bit in a hand router.
This close-up shot actually shows both the beautiful and the ugly aspects of this reclaimed wood: Doffy had used the next-to-highest grade of redwood available, old-growth with some knots, and you can see the striations of weathering in the piece at the far left, the gorgeous tight grain of the good board at center, and the cracked knot in the piece below.  Part of my job is to stitch together combinations of lengths to minimize knots--and sometimes I will rip a 5 1/4" plank down to 4" to get rid of bad knots or severely weathered surface, and salvage a useful board out of something that would be marginal at full width.

This innocuous-looking single run probably ate up a good hour and a half this evening (Go Giants! Coors Field! Home runs!), as it is what I call the Reference Board--as straight as I can make it, and as perpendicular to the joists as I can make it, allowing for the fact that the ledger and the house are both not completely straight.  But having this first board straight is key to the whole rest of the decking: I will be pulling all the other boards to this board (with 1/2" thick spacer blocks), so if I get it wrong, the mistake is propagated through every aspect of the deck. I use a string and sightlines (lying in the dirt here, and standing on a ladder on the far side) and a 3-4-5 square and every method I can, and tomorrow I will double check it before filling in the rest of the deck screws and calling it good enough.

Once I'd put in a few dozen screws in the three boards that make up this line I continued to test-fit five or six more ranks, just because it wasn't raining and the ballgame was still going on--quiet work that won't annoy the neighbors, and that requires rhythm and patience and creativity (to avoid flaws in boards, and to vary the seam-lines so that adjacent ranks don't have breaks in too close proximity).

The black Vycor membrane on the top of the joists is a rot inhibitor--the old deck had roofing paper strips on the joists, so one of my tasks when de-nailing is to peel this tar-y strip off each board so it will run (relatively) smoothly through the planer.  Because the Vycor membrane is super-sticky (and sticks best to itself), I tend to attach it in manageable-length strips of about 2 feet long.  The screws go through this membrane and seal well, which should lead to a long-lasting deck.

Tomorrow I plan to do a mixture of tasks after confirming that we can live with the placement of that first board: I'll de-nail some more of the pile, do an hour or so of sawing, and hour or so of planing, a half-hour of rounding, and a couple of hours of layout, including marking and cutting boards.  Muggs will probably arrive with rail / post lumber in the late afternoon, and I'll ask him to pick up a couple of 800-piece boxes of 3" deck screws so the actual surface can start to get finished.